
The existing capacity is 34.95 MW installed in the states of Andhra Pradesh, Tamil Nadu and Maharashtra with capacity utilization of 16%, while the proposed capacity addition will be 3.6 MW. The period within which the proposed capacity is to be added is 3 months. The investment required is Rs 8.52 crore including GST.
Karma Energy spearheads the development of Renewable Energy Sector viz. Wind Power, Small Hydro Power of the Group.
Bhupendra Singh Chundawat is a seasoned technology journalist with over 22 years of experience in the media industry. He specializes in covering the global technology landscape, with a deep focus on manufacturing trends and the geopolitical impact on tech companies. Currently serving as the Editor at Udaipur Kiran, his insights are shaped by decades of hands-on reporting and editorial leadership in the fast-evolving world of technology.



