NTPC Green Energy is currently trading at Rs. 104.45, up by 0.95 points or 0.92% from its previous closing of Rs. 103.50 on the BSE.

The scrip opened at Rs. 103.25 and has touched a high and low of Rs. 105.05 and Rs. 103.25 respectively. So far 124183 shares were traded on the counter.
The BSE group ‘B’ stock of face value Rs. 10 has touched a 52 week high of Rs. 155.30 on 04-Dec-2024 and a 52 week low of Rs. 84.60 on 03-Mar-2025.
Last one week high and low of the scrip stood at Rs. 105.60 and Rs. 100.45 respectively. The current market cap of the company is Rs. 88139.41 crore.
The promoters holding in the company stood at 89.01%, while Institutions and Non-Institutions held 6.49% and 4.49% respectively.
NTPC Green Energy has commissioned commercial supply of 49-megawatt (MW) capacity at Khavda Solar Energy Project at Bhuj in Gujarat. This marks the third part commissioning of the 300 MW project.
The first part, with a capacity of 142.2 MW, and the second part, with a capacity of 32.8 MW, became commercially operational with effect from June 28, 2025 and June 30, 2025, respectively.
NTPC Green Energy is a wholly owned subsidiary of NTPC, a ‘Maharatna’ central public sector enterprise. The company is mainly engaged in the activity of developing, building, owning, operating and maintaining utility scale grid connected solar and wind power projects (through O&M operations and in-house engineering).
Bhupendra Singh Chundawat is a seasoned technology journalist with over 22 years of experience in the media industry. He specializes in covering the global technology landscape, with a deep focus on manufacturing trends and the geopolitical impact on tech companies. Currently serving as the Editor at Udaipur Kiran, his insights are shaped by decades of hands-on reporting and editorial leadership in the fast-evolving world of technology.

