
EIH has set up a captive solar power plant to meet electricity needs of its Gurugram properties, The Oberoi and Trident. The captive power plant in Balasar, Haryana will generate 7.5 MW of electricity to meet the energy demands of the two hotels.
Spread over 25 acres, the solar power plant has 27,000 solar panels installed. The Oberoi and the Trident in Gurugram aim at reducing CO2 emissions by 12,344 tons per year.
EIH is engaged in the business of operating and managing luxury hotels, restaurants, management contracts and travel and tours.
Bhupendra Singh Chundawat is a seasoned technology journalist with over 22 years of experience in the media industry. He specializes in covering the global technology landscape, with a deep focus on manufacturing trends and the geopolitical impact on tech companies. Currently serving as the Editor at Udaipur Kiran, his insights are shaped by decades of hands-on reporting and editorial leadership in the fast-evolving world of technology.



