Kota Faces Seven-Hour Power Cut Today Due to Maintenance Work

Kota, March 11 – The private electricity company KEDL (Kota Electricity Distribution Limited), which manages Kota’s power supply, has announced a planned power outage across multiple areas due to ongoing maintenance and infrastructure upgrades. The electricity shutdown will last between five to seven hours in different localities.

Power Cut
Power Cut

Residents are advised to plan their schedules accordingly, as maintenance work will temporarily disrupt power supply across key regions.

Areas Affected by Power Cut and Timings

🔹 10:00 AM to 2:00 PM:

  • Gumanpura
  • Roteda
  • Bhadana
  • Neelkanth
  • Akashvani Colony
  • Mahaveer Nagar
  • Nayapura

🔹 10:00 AM to 3:00 PM:

  • Puri Enclave
  • Rajendra Vihar
  • Akashvani Colony (near Vallabh Bari, Porwal Bhawan, Mehta Nursing Home, Vallabh Bari area)
  • Roteda Road, Sharda Vihar, Shubham Vihar Bhadana, Neelkanth Residency, and nearby localities

🔹 10:30 AM to 12:00 PM:

  • Mahaveer Nagar 1st
  • MPB Wali Line
  • Swami Vivekananda School (nearby areas)
  • Jagannath Kachori vicinity
  • Sajjan Medical Store area
  • Sunday Community Hall sector
  • Desh Ki Dharti Circle (nearby locations)
  • Jain Mandir
  • Narcotics Colony (Mahaveer Nagar 1st & Special), Vishwakarma Nagar Special
  • Mahaveer Nagar Sector 10, 11, Parijat Colony, CP Vijayvargiya area
  • Near Dr. Lohani Maternity Hospital

🔹 10:30 AM to 2:30 PM:

  • Payal Hotel
  • Manipuram Gold
  • Nayapura Petrol Pump and surrounding areas

🔹 10:30 AM to 3:00 PM:

  • Giriraj Dham
  • Shrinath Residency
  • Akshat Villa
  • Shri Krishna Residency
  • Vinayak Dham
  • Pratap Residency (Sogariya area)

🔹 11:00 AM to 2:00 PM:

  • Parikh Hospital
  • Bala Kund
  • Basant Vihar Special (only 160 KVA Parikh Hospital DTR)

🔹 11:00 AM to 5:00 PM:

  • Keshavpura Sector-4 (longer outage due to extensive maintenance work)

Reason for Power Cut

The electricity shutdown is part of KEDL’s ongoing efforts to maintain and upgrade power lines in Kota. The company has assured residents that these measures are aimed at improving service reliability and preventing unexpected breakdowns in the future.

LPG Users Alert: Complete eKYC by August 16 Magic Photo Editor drops ₹12,579 before Pixel 11 launch! Jio’s Best Offer: Free WiFi for 1 Month, 100Mbps Internet!