Friday , June 21 2019
Breaking News
Home / BUSINESS / BHEL commissions 2 more units of Kaleshwaram Lift Irrigation Scheme Package-6
BHEL commissions 2 more units of Kaleshwaram Lift Irrigation Scheme Package-6

BHEL commissions 2 more units of Kaleshwaram Lift Irrigation Scheme Package-6

Bharat Heavy Electricals (BHEL) has successfully commissioned two more pumping units (Units 3 & 4) of 116 MW each, of the 7×116 MW Kaleshwaram Lift Irrigation Scheme (LIS) Package-6 in Telangana. BHEL had earlier commissioned Units 1 & 2 of the same project in April, 2019. Significantly, the pump for each unit is designed to lift 89.16 cumecs (cubic metres per second) of water by 105.5 metres.

BHEL’s scope in the project comprises complete Electrical & Mechanical (E&M) works including design, manufacture, supply and supervision of erection and commissioning of 7 sets of Vertical Pump-Motor sets along with associated auxiliaries. The equipment has been manufactured and supplied from BHEL’s manufacturing units at Bhopal, Rudrapur and Bengaluru, while the supervision of erection and commissioning at the site was carried out by the company’s Power Sector Southern Region division, Chennai.

BHEL is India’s largest engineering and manufacturing company of its kind. It is a power plant equipment manufacturer and operates as an engineering and manufacturing company.

Click & Download Udaipur Kiran App to read Latest News

Leave a Reply

Your email address will not be published. Required fields are marked *

*

Inline

Click & Download Udaipur Kiran App to read Latest News

Inline

Click & Download Udaipur Kiran App to read Latest News